Radio network rollout and communications modernisation

TandemIT provides client-side programme management for organisations rolling out or modernising a radio network across distributed sites. We coordinate site workstreams, coverage validation, vendor deployment and operational cutover so the new network is accepted on evidence and operations keep running. The approach draws on documented principal experience leading an analogue to digital radio modernisation programme across a distributed site footprint. TandemIT is not the equipment vendor, installer or radio engineer.

Speak With TandemIT

Site acquisition and deployment scheduling

A distributed rollout depends on sites being ready: access, tenure, consents, power, structures and backhaul. Site acquisition activities such as lease negotiation and consents are carried out by the owner's property, planning and legal specialists; TandemIT tracks them as programme dependencies so deployment is scheduled against real readiness.

The digital radio modernisation case study records site survey, design approval and deployment scheduling across a footprint with varied infrastructure, power and access constraints.

  • Site readiness tracker and dependencies
  • Survey and design approval coordination
  • Deployment schedule across the footprint

Coverage validation

Coverage acceptance needs an agreed baseline, test locations, operating conditions and pass criteria based on where and how people actually work. The supplier and technical specialists define and run the tests; TandemIT coordinates plans, evidence, exceptions and retests so acceptance decisions are traceable.

In the case study, the programme delivered improved coverage and resilience. TandemIT does not certify designs or guarantee coverage.

Vendor deployment oversight

Rollouts usually involve several parties across radio infrastructure, subscriber devices and integration. An integrated plan, a responsibility matrix and regular reporting keep prerequisites, defects and handoffs visible, and keep supplier commitments connected to delivery milestones.

The principal coordinated vendors and integrators across infrastructure, devices and integration, and managed subscriber device strategy, fleet planning and rollout.

  • Integrated multi-vendor delivery plan
  • Interface and responsibility matrix
  • Fleet planning and rollout coordination

Operational cutover and decommissioning

Set go/no-go criteria, named decision makers, a cutover sequence and continuity arrangements with operational leaders. Parallel running is an option only where the design and procedures support it. Retire legacy infrastructure only after agreed acceptance and stability conditions are met.

The case study records cutover, parallel running and controlled decommissioning of the legacy analogue network, with continuity of operational communications maintained throughout, alongside training, readiness and acceptance management with end users.

Relevant principal experience

The case study is anonymised principal experience gained in prior senior roles, not evidence that TandemIT held that contract. Scope, specialist responsibilities and support arrangements are agreed for each engagement.

Preparing emergency services communications for the Public Safety Network? See the organisation-side transition and readiness support.

Public Safety Network programme delivery

Typical engagement deliverables

The scope and deliverables are agreed for each engagement, rather than assumed to apply to every project.

  • Integrated rollout programme plan
  • Site readiness and dependency tracker
  • Coverage validation coordination plan
  • Vendor responsibility matrix and reporting
  • Fleet rollout plan
  • Cutover, continuity and decommissioning plan
  • Acceptance evidence and handover pack